I was introduced to a new mountain gem this weekend. I considered myself an outdoor guru of Southwestern Virginia but more and more I'm finding new and hidden places that I had never heard of. This weekend on a fishing excursion, I was escorted to Laurel Bed Lake. On top of Clinch Mountain, at the borders of Smyth, Russell, Washington and Tazewell Counties, the man-made lake surface of 330 acres rests at 3674 feet above sea level. Being so far up and away from the closest town of Saltville (elevation 1718) made me want to find out why this lake was built. With most lakes in my area, they are to either provide water to a town nearby or electricity. It appears that Laurel Bed was made just for us to enjoy and to provide the state with additional fishing fee reveue. In an effort to find something digging a little more deeply into the history of the lake than what the site above told me, I came across the Laurel Bed Lake Liming Project. The article below by Dr. Dan Downey lays out a history of the lake as well as the efforts to preserve a habitat for native fish and eradicate an aggressor that was not intended to be in the lake.
A Brief History of the Liming of Laurel Bed Lake
By Dan Downey
Laurel Bed Lake is a 330 acre high mountain impoundment located in the Clinch Mountain Wildlife Management Area (CMWMA). The CMWMA is a 25,000 acre piece of mountainous real estate that was acquired for Virginia hunters and fishermen in early the 1960s with revenues raised from fishing and hunting licenses. A central feature of this property is a picturesque stream known as Big Tumbling Creek that flows several miles down through a steep and narrow gorge filled with rhododendron and mountain laurel. When the CMWMA was created, times were different for trout fishermen in the Commonwealth and the name of the game was catch and keep. The trout season back then consisted of several stockings of catchable sized fish in the months of April and May, with most of the fish caught out soon after the season opened. In an effort to provide for a longer trout season and the opportunity for people to fish over freshly stocked trout, Big Tumbling Creek was made into a fee fishing trout stream. Under this regulation, trout are stocked daily (except Sunday) and fishermen pay a daily fee to fish for them. The fee fishery was very popular when it was initiated, attracting more than 35,000 people per year. (However, times have changed - with the many special regulation streams we have now, year round trout season and other changes in the trout program, about half the number of permits are sold as in the past.) Soon after the fee fishery was established it was found that as with most headwater streams in Virginia, Big Tumbling Creek experienced very low flows in the latter part of the summer that limited fishing. To offset the low flow conditions, Laurel Bed Lake was built in 1967 on a major tributary (Laurel Creek) to provide stream flow augmentation to the fee fishing area via regulated water releases. Obviously a large lake in a Wildlife Management Area provides an opportunity for fishing even if the main reason for its existence is stream flow augmentation. Thus the lake was stocked with brook trout (Salvelinus fontinalis) and included as part of the fee area. Unfortunately there were problems in the development of the fishery from the outset. It soon became apparent that low pH - acid conditions - were the cause of much of the trouble here. The watershed of Laurel Bed Lake is mainly low solubility siliciclastic rock. It provides very little natural buffer to offset the acid rainfall of the region. In addition, the lake was built on top of a wetland, which is naturally acidic. So in the 1970s, Bob Wollitz and John Jesse, the regional fisheries biologists at that time, added 60 tons of slaked lime to the lake to increade alkalinity. This was done manually by slurrying the material from a boat. This effort had remarkable results: aquatic vegetation established and the stocked brook trout resident in the lake grew fat from an abundance of aquatic insects. These were the glory days of the "bed" that many of the local fishermen still talk about. Catches of a hundred fish per day - with some in the 16" to 18" range - were not unusual. Unfortunately, however, things took a turn for the worse. First, rock bass (red-eyes or goggleyes, Ambloplites rupestris) became established in the lake. These small sunfish are often called the "schoolboy's friend" because they are prolific and easy to catch. But in Laurel Bed Lake, they were considered to be a nuisance fish as they outcompeted the brookies for the aquatic insect food supply and trout growth rates decreased. Worse yet, within a few years the pH of the lake gradually dropped. These things caused the brook trout fishery to become dependent on annual put and take stockings and there was little carry over of trout from year to year. In 1996, the new fisheries biologist for the region, Tom Hampton, was handed the task of "re-making the bed" - to try to restore the fishery as before. Tom asked Dr. Dan Downey of JMU, who has done extensive research on surface water acidity and liming in Virginia, to assist in this project. The lake, its feeder stream, physical characteristics and water chemistry were studied in great detail. It was found that the lake was averaging pH 4.9 in 1995 and 1996. Clearly the fishery could only be reestablished by raising the pH with lime once again. It was decided to use a three prong approach to liming: first the feeder stream would be treated with a helicopter to deliver the limestone to the headwaters. This was the same approach that had successfully been developed for liming streams in the National Forest, such as the recently treated St. Mary's Wilderness. Then the upper lake shoreline, where there is a lot of wave action, would be limed. Finally the main body of the lake would be treated with lime directly. The idea here was to raise pH and other water quality parameters (WQPs), such as base cation concentration, as soon as possible, then to maintain this pH with a minimum of reapplications. Things became complicated from the outset. First, the concrete riser at the lower end of the lake, which contains the water release gate, had to be repaired. As it turned out, this reconstruction effort later necessitated the draining of the lake. Then the first phase of liming did not go well. The feeder stream was to be limed in November 1996. After only a few trips, the feeder stream liming had to be abandoned due to hazardous flying conditions, so the upper lake shoreline was treated with the limestone that was supposed to have been placed in the stream. In 1997, the lake was drained for the repair work. The residual water was treated with rotenone to remove the stunted population of red-eyed sunfish that had naturalized in the acidic lake. By the fall of 1997, the construction was finished and the lake was slowly refilled. Approximately 90 tons of aglime was slurried into the lake in a three day period in October, 1997. Concurrently over 15,000 brook trout fingerlings, four to six inches in length were introduced. With winter snows and rain, the lake had refilled to full pool by February, 1998. The WQP's were significantly improved, such as the pH values increasing from 4.9 to 6.5 and acid neutralizing capacity values increasing from negative values to good positive values. By the spring of 1998, it was apparent that the brook trout had not only survived through the winter, but had grown and were doing quite well. Netting in the fall of 1998 revealed that they had grown to nine to thirteen inches in this one year period. A second lake liming was then conducted in October 1998 with over 150 tons of aglime slurried into the lake. Another 22,000 brook trout fingerlings were then introduced. The netting and other surveys revealed that the red-eye sunfish population had returned, either as a result of illegal introductions by fishermen or because they were not completely exterminated when the lake was down. After careful consideration, 8000 smallmouth bass (Micropterus dolomieu) fingerlings were introduced to provide a predatory fish which could control the red-eye sunfish. Smallmouth bass had previously been stocked in this lake years ago but had not survived. That was done, however, when the pH was low. Electrofishing along the shoreline in the spring of 1999 revealed that the smallmouth bass survived the winter and were doing well. There were large numbers of brook trout in the lake in the 10-14" range, with a few fish near 16" length, indicating a healthy population and good growth rates. By the year 2002, the lake had also become an outstanding smallmouth bass fishery with some bass exceeding 17" in length. As mentioned above, Laurel Bed Lake is drawn down in the summer months to augment the flow of Big Tumbling Creek. This discharge releases much of the lime treatment. Thus maintenance liming has been done in the fall months to replenish the material lost to discharge or used up in the treatment of the acidity of the lake. It is expected that the lake will continue to be a popular fishery for brook trout and eventually also produce good smallmouth bass fishing. Thus liming has been found to be a successful tool for improving water quality habitat in this lake.
2 comments:
I loved laurel bed lake. I used to spend hours up there with family and friends. I remember when they drained the lake I have a picture of me and a pal standing there in the lake bed. My father grew up a couple of miles away from there, he used the stock fish during the summer.
My mom grew up and lived on Tumbling Creek in the first half of the 20th century. She described numerous flooding events when what she called cloud bursts occurred on the mountain. I remember her saying they could hear these floods coming down the mountain, and that water got up into Adrian Lane at the "worsh hole" which is maybe 15+ foot above the creek bed at that point. We moved away from that area in the mid 1950s, but family still live in there. I remember hearing about such an events in the early 1960s which made the news in Abingdon. As I recall there was property damage, injuries, and maybe fatalities. My recollection is that being the initial reason for the lake and the MGMT area project. These events would have been debris flows similar to those recently experienced in western North Carolina. Needless to say if such an event happened when anglers were in the creek there would probably be fatalities.
Post a Comment